Compara cotizaciones antes de firmar un contrato de concreto

Comparacion de Cotizaciones de Contratistas de Concreto

Primero la respuesta: sube o ingresa tus cotizaciones de contratistas. Compara alcance, materiales, mano de obra, garantia y terminos de pago lado a lado.

Diferencia tipica entre cotizaciones

15–30% entre la mas alta y la mas baja

Una diferencia mayor puede indicar alcances diferentes, no solo precios distintos.

Elementos frecuentemente omitidos

Base de grava, refuerzo, acabado

Verifica que cada cotizacion incluya los mismos elementos antes de comparar precios.

Bid leveling workspace

Compare la oferta, no solo el precio

Use this concrete-specific worksheet to level three contractor bids by total price, price per square foot, price per cubic yard, included scope, missing scope, access risk, payment terms, and follow-up questions before you sign.

La oferta más baja no siempre es la mejor oferta nivelada.

Bid A is the lowest total at $6,400, while Bid B has the strongest written scope at 97/100.

Lowest total

$6,400

Bid A: Do not rank on price yet

Best written scope

97/100

Bid B: Complete mid bid

Critical scope checks

11

Prep, base, delivery, access, payment, warranty

OfertaTotalPrecio normalizadoPuntuación del alcanceDecision
Bid A
Lowest lump sum
500 sq ft patio, 4 in slab, residential backyard access
$6,400
50% deposit noted

$13 / sq ft

$941 / yd3

6.80 yd3 concrete

High scope risk - 100/100

3/11 scope items named.

Do not rank on price yet

Lowest total, but not the safest leveled bid until missing scope is written.

Bid B
Complete mid bid
500 sq ft patio, 4 in slab, base and reinforcement named
$7,800
30% deposit noted

$16 / sq ft

$1,147 / yd3

6.80 yd3 concrete

Lower follow-up risk - 12/100

11/11 scope items named.

Comparable after final checks

Most comparable sample because scope, access, payment, and closeout are written.

Bid C
Premium access-heavy bid
500 sq ft patio, limited access, demo and haul-off included
$9,200
35% deposit noted

$18 / sq ft

$1,353 / yd3

6.80 yd3 concrete

Lower follow-up risk - 29/100

10/11 scope items named.

Comparable after final checks

Price needs context because at least one critical scope item is missing.

Included scope matrix

Elemento del alcanceBid ABid BBid C
Site prep and excavation
scope
MissingIncludedIncluded
Base depth and compaction
scope
MissingIncludedIncluded
Forms and layout
scope
IncludedIncludedIncluded
Rebar or wire mesh
scope
MissingIncludedMissing
Concrete delivery or supplier terms
delivery
IncludedIncludedIncluded
Pump, buggy, or truck access
delivery
MissingIncludedIncluded
Finish, curing, and control joints
finish
IncludedIncludedIncluded
Cleanup, washout, and haul-off
closeout
MissingIncludedIncluded
Deposit, draws, and payment terms
contract
MissingIncludedIncluded
Change-order rules and exclusions
contract
MissingIncludedIncluded
Warranty or workmanship note
contract
MissingIncludedIncluded

Questions before deposit

Is base stone, compaction, and subgrade repair included?
Who pays if the truck cannot reach the pour?
What is excluded from the lump-sum price?
Ask whether site prep and excavation is included.
Ask whether base depth and compaction is included.
Ask whether rebar or wire mesh is included.
Who handles permits or inspection if required?
What base depth is assumed after excavation?

Download the worksheet

The export is a planning worksheet. Replace every example value with current contractor bids before making a hiring decision.

bid,style,total_usd,area_sq_ft,concrete_yd3,price_per_sq_ft,price_per_yd3,included_scope_count,missing_scope,completeness_score,risk_score,risk_label,decision,follow_up_questions
Bid A,Lowest lump sum,6400,500,6.8,12.8,941.18,3,"Site prep and excavation; Base depth and compaction; Rebar or wire mesh; Pump, buggy, or truck access; Cleanup, washout, and haul-off; Deposit, draws, and payment terms; Change-order rules and exclusions; Warranty or workmanship note",18,100,High scope risk,Do not rank on price yet,"Is base stone, compaction, and subgrade repair included?; Who pays if the truck cannot reach the pour?; What is excluded from the lump-sum price?; Ask whether site prep and excavation is included.; Ask whether base depth and compaction is included.; Ask whether rebar or wire mesh is included."
Bid B,Complete mid bid,7800,500,6.8,15.6,1147.06,11,,97,12,Lower follow-up risk,Comparable after final checks,Who handles permits or inspection if required?; What base depth is assumed after excavation?; How are weather delays and schedule changes handled?
Bid C,Premium access-heavy bid,9200,500,6.8,18.4,1352.94,10,Rebar or wire mesh,88,29,Lower follow-up risk,Comparable after final checks,Is rebar or wire mesh included in the premium access price?; What finish tolerance or finish defect policy is included?; Can the access allowance be separated from the concrete scope?; Ask whether rebar or wire mesh is included.

Interactive workflow

Run the numbers, then save or export the project

View planning notes
Best reviewed quote
Ready-mix supplier A
Red flags
0
Proposal total
$3,824
Pour window
171 min
Entradas del revisor de cotizaciones
Resultados de revision de cotizacion
CotizaciónTotalUnidadEstado
Ready-mix supplier A
Ready-mix score 100
$760
$253.33/yd3
$3.45/sq ft
Good quote
Contractor bid B
Contractor score 83
$3,350
$1,116.67/yd3
$15.23/sq ft
Good quote
Bagged concrete run
Bagged score 74
$1,175
$391.67/yd3
$5.34/sq ft
Review scope

Ready-mix supplier A

0 missing
  • Scope checklist looks complete for this quote type.

Contractor bid B

1 missing
  • Total is more than 25% above the quote set average.
  • Missing scope: Permit, inspection, or code items.

Bagged concrete run

2 missing
  • Bagged route may be labor-heavy at this volume.
  • Missing scope: Cleanup, washout, and disposal, Pump, buggy, or wheelbarrow placement.

Guarda esta estimacion o descarga un reporte PDF

El reporte PDF usa el resultado calculado actual. Guarda la estimacion primero cuando quieras reutilizar los datos despues.

Comparacion lado a lado
Ingresa multiples cotizaciones para ver una comparacion estructurada de alcance y precio.
Lista de verificacion de alcance
Verifica que cada cotizacion incluya base, refuerzo, acabado, limpieza y garantia.
Analisis de precio
Identifica diferencias de precio injustificadas o elementos faltantes en las cotizaciones.

Concrete bid signals to compare

A lower concrete bid can still be the worse deal if scope, access, or change-order rules are missing. Use these checks before you choose a contractor.

Signal to checkWhat it meansNext step
Material-only wordingThe bid may include concrete but skip excavation, gravel base, compaction, forms, reinforcement, control joints, curing, cleanup, or haul-away.Ask the contractor to write what is included and excluded before comparing against another bid.
Different slab thickness or base depthTwo bids can look similar while assuming different concrete thickness, gravel depth, compaction, or reinforcement.Use the volume and cost calculators to normalize quantity, then compare the written scope.
Delivery and access are vagueShort-load fees, wait time, pump, buggy, wheelbarrow distance, truck reach, and site access can change pour-day cost.Run the pour planner and local cost tab before accepting the bid.
Payment terms are thinDeposit size, draw schedule, change orders, cancellation fees, permits, inspection responsibility, and warranty language should be clear.Record follow-up questions and keep a saved bid review before paying.
Cleanup or repair is not namedForms removal, washout, lawn repair, surface protection, debris, and final cleanup can become dispute points.Mark cleanup as missing scope until it is written into the bid.

Related concrete planning tools

Move from a single calculation into a purchase, proposal, or pour-day decision with connected calculators and checklists.

Como comparo cotizaciones de contratistas de concreto?

Asegurate de que cada cotizacion incluya los mismos elementos: base de grava, encofrado, refuerzo, especificacion de mezcla, acabado y limpieza. Una cotizacion mas baja puede simplemente tener menos alcance.

Cuantas cotizaciones debo obtener para trabajo de concreto?

Al menos 3 cotizaciones de contratistas licenciados. Esto te da un rango de mercado y te protege contra precios inflados o propuestas incompletas.

Que debe incluir una cotizacion de concreto?

Dimensiones y espesor de la losa, especificacion de mezcla (psi), tipo de base (grava), refuerzo (varilla o malla), tipo de acabado, limpieza, garantia y terminos de pago.

Es normal que las cotizaciones varien mucho?

Una variacion del 15–30% es normal. Variaciones mayores generalmente indican diferentes alcances. Siempre pregunta que esta incluido — no solo el precio final.

Planning disclaimer

Esta herramienta es para comparacion de planificacion. Siempre verifica licencias, seguros y referencias de contratistas antes de contratar.