Bomba de concreto vs carretilla: cuando tiene sentido cada opcion

Calculadora: Bomba de Concreto vs Carretilla

Primero la respuesta: ingresa el volumen de concreto y la distancia al area de vaciado. Compara el costo total con bomba vs carretillas.

Costo tipico de bomba de concreto

$400-800 para trabajos residenciales

La bomba linea de boom cuesta mas que la bomba de pluma. El costo se distribuye entre el volumen total.

Punto de equilibrio tipico

3-5 yd3 para distancias de 50+ pies

Para distancias cortas y buen acceso, las carretillas pueden ser mas economicas.

Interactive workflow

Run the numbers, then save or export the project

View planning notes
Best reviewed quote
Ready-mix supplier A
Red flags
0
Proposal total
$3,824
Pour window
171 min
Planificador de logistica del dia de vaciado
Riesgo del día de coladoRed flag
Placement window171 minutes
Wait time111 minutes
Possible wait fee$176
  • Estimated placement window: 171 minutes.
  • Potential truck wait time: 111 minutes.
  • Wheelbarrow placement is sensitive to distance, slope, and crew pace.

Guarda esta estimacion o descarga un reporte PDF

El reporte PDF usa el resultado calculado actual. Guarda la estimacion primero cuando quieras reutilizar los datos despues.

Calculo de costo de bomba
Ingresa el costo de alquiler y el volumen para el costo por yarda cubica.
Analisis de carretillas
Calcula la mano de obra y el tiempo necesarios para mover el concreto con carretillas.
Comparacion de punto de equilibrio
Ve exactamente en que volumen y distancia la bomba se vuelve mas economica.

When wheelbarrows stop being the cheaper plan

The comparison should be made on placed total and pour risk, not on the pump line alone.

Signal to checkWhat it meansNext step
Short, flat route under about 1.5 yd3Wheelbarrows can be reasonable when the truck is close, the route is firm, and enough helpers are active.Still confirm included unload time, wait rate, route protection, and washout before the truck is scheduled.
75 ft route or 2 yd3+ pourA wheelbarrow plan can run past a common free unload window and create wait fees or finish risk.Price a buggy, extra helper, chute extension, or line pump before approving the ready-mix order.
120 ft route, slope, tight gate, soft ground, or hot weatherTrip count understates fatigue, safety, truck wait, cold-joint, and surface-finish exposure.Ask for a written pump or buggy quote with setup, hose, washout, standby, and crew responsibilities.

Related concrete planning tools

Move from a single calculation into a purchase, proposal, or pour-day decision with connected calculators and checklists.

Cuando vale la pena alquilar una bomba de concreto?

Generalmente para 3+ yd3 con distancias de mas de 50 pies, acceso restringido (pasos estrechos, pendientes), o cuando el tiempo de vaciado es critico.

Cuanto cuesta alquilar una bomba de concreto?

Las bombas de pluma residenciales cuestan $400-800 para un dia. Las bombas de boom son $1,000-2,500. La tarifa tipicamente incluye operador.

Puedo vaciar concreto sin bomba ni carretilla?

Si para pequeños proyectos: el camion puede vaciar directamente en las formas si tiene acceso. Esta es la opcion mas economica cuando es posible.

Es mejor una bomba de boom o de linea?

La bomba de boom llega mas lejos (hasta 100+ pies) pero cuesta mas. La bomba de linea es mas economica para distancias de 30-100 pies.

Planning disclaimer

Los costos son estimados. Los precios de alquiler de bombas varian por region y tipo de bomba.