Precios de concreto volumetrico: solo pagas lo que usas

Calculadora de Precios de Concreto Volumetrico

Primero la respuesta: el concreto volumetrico mezcla en sitio y cobra por lo usado, eliminando el cargo por carga pequena. Compara el total para tu volumen.

Volumetrico vs estandar

$180-280/yd3 vs $130-200/yd3

Mas caro por yarda pero sin minimo ni cargo por carga pequena.

Mejor para

0.5-3 yd3 de volumen

Ideal cuando necesitas exactamente lo que usas.

Interactive workflow

Run the numbers, then save or export the project

View planning notes
Best reviewed quote
Ready-mix supplier A
Red flags
0
Proposal total
$3,824
Pour window
171 min
Entradas del revisor de cotizaciones
Resultados de revision de cotizacion
CotizaciónTotalUnidadEstado
Ready-mix supplier A
Ready-mix score 100
$760
$253.33/yd3
$3.45/sq ft
Good quote
Contractor bid B
Contractor score 83
$3,350
$1,116.67/yd3
$15.23/sq ft
Good quote
Bagged concrete run
Bagged score 74
$1,175
$391.67/yd3
$5.34/sq ft
Review scope

Ready-mix supplier A

0 missing
  • Scope checklist looks complete for this quote type.

Contractor bid B

1 missing
  • Total is more than 25% above the quote set average.
  • Missing scope: Permit, inspection, or code items.

Bagged concrete run

2 missing
  • Bagged route may be labor-heavy at this volume.
  • Missing scope: Cleanup, washout, and disposal, Pump, buggy, or wheelbarrow placement.

Guarda esta estimacion o descarga un reporte PDF

El reporte PDF usa el resultado calculado actual. Guarda la estimacion primero cuando quieras reutilizar los datos despues.

Comparacion de costo total
Compara el total de volumetrico, camion estandar y bolsas para tu volumen.
Punto de equilibrio
Ve en que volumen cada opcion se vuelve la mas economica.
Ventajas del volumetrico
Paga solo por lo que usas, ajusta la mezcla en sitio, sin esperas.

When volumetric concrete deserves a quote

Volumetric delivery is strongest when the final amount is uncertain or a standard truck minimum creates too many unused paid yards.

Signal to checkWhat it meansNext step
Quantity is uncertainMetered delivery can reduce over-ordering if the supplier truly bills actual production after a minimum.Ask how the metered quantity is measured, rounded, and printed on the ticket.
Ready-mix minimum exceeds actual yardsA higher volumetric $/yd3 can still win when standard ready-mix bills unused concrete.Compare delivered totals after trip, setup, wait-time, access, tax, and washout fees.
Bag count is high but access is awkwardBags can look cheaper until dry weight, mixer rental, helpers, and finish timing are included.Run the bag fallback and quote at least one ready-mix or mini-mix alternative.

Related concrete planning tools

Move from a single calculation into a purchase, proposal, or pour-day decision with connected calculators and checklists.

Que es el concreto volumetrico?

Los camiones volumetricos llevan los ingredientes por separado (cemento, arena, grava, agua) y mezclan en sitio. Puedes ordenar exactamente el volumen que necesitas.

Cuando es mejor el volumetrico?

Para pedidos de 0.5-3 yd3 donde el cargo por minimo del camion estandar encarece significativamente el costo.

Es el volumetrico de la misma calidad?

Si, alcanza las mismas resistencias que el premezclado cuando se mezcla con las proporciones correctas.

Puedo cambiar la mezcla en sitio?

Si, una ventaja del volumetrico es poder ajustar el slump (trabajabilidad) o la resistencia en el momento.

Planning disclaimer

Los precios de concreto volumetrico varian. Siempre obten cotizaciones de proveedores locales.