Lineal Pies, porfil, and Cotizacion Alcance

Concrete Curb Calculator

Estimate concrete for curb, curb and gutter, rolled curb, and driveway apron edge work. Enter linear feet and profile dimensions to calculate cubic yards, bags, ready-mix material cost, and cost per linear foot before you compare a contractor quote.

Enter Curb and Gutter Dimensions

Vista previa del perfil

Curb area: 0.2500 ft2Gutter area: 0.7500 ft2Gross volume: 3.7037 yd3

Verificación de material premezclado

$822.22 total, $8.22/ft

Verificación de material en bolsas

$920.00 total, 184 bolsas

Normalización de cotización instalada

$65.00/ft

Guarda esta estimacion o descarga un reporte PDF

El reporte PDF usa el resultado calculado actual. Guarda la estimacion primero cuando quieras reutilizar los datos despues.

Resultados

Estimacion en vivo
Volumen de concreto

4.0741 yd³

110 ft³ / 3.1148 m³

Bolsas necesarias

184 bolsas

Redondeado a bolsas enteras

Costo estimado

$822.22

Basado en el precio por bolsa

Desperdicio

10%

Incluido en el volumen total

Estimacion de concreto en yardas

Tu estimacion de 4.0741 yd3 equivale aproximadamente a 184 bolsas despues del desperdicio. Usa el numero de yardas para elegir como comprar antes de ordenar.

Zona de ready-mix o revision de cotizacion

Con este volumen, revisa la entrega ready-mix o una cotizacion de contratista por PSI, slump, yardas minimas facturables, alcance de canaleta, necesidad de bomba o buggy y reglas de espera.

Siguientes revisiones de cotizacion

Usa este volumen para comparar ready-mix entregado, concreto en bolsas, entrega, cargos de carga corta y huecos de cotizacion antes de ordenar.

Respuesta rapida

A 100 ft curb and gutter run with a 6 in by 6 in curb and an 18 in by 6 in gutter needs about 4.07 yd3 with 10% waste. At $165 per yd3 plus a $150 delivery or short-load fee, the material-only ready-mix check is about $8.22 per linear foot. Installed quotes can be much higher because they may include removal, forms, drainage, permits, traffic control, access, and cleanup.

Alcance de presupuesto de bordillo

Convierta yardas de bordillo en lista de verificación de oferta por pie lineal

Commodity curb calculators stop at profile volume. Curb and gutter jobs also need returns, radii, forms, finish, removal, drainage, traffic control, access, permits, inspection, and a normalized installed price per linear foot.

Scope status

Right-of-way quote review

34/100 quote-readiness score

Measured run

100 linear ft

1 run(s), 1 sq ft profile

Buying pressure

Ready-mix likely

$8.22/linear ft material

Elemento del alcanceEstadoQue verificar
Profile dimensionsconfirmCurb and gutter dimensions are included. Confirm the exact municipal or plan profile before ordering.
Linear feet, returns, and radiiaskLong runs need written measurement rules for radii, returns, driveway transitions, and curb cuts.
Forms, finish, and strippingaskAsk whether forms, stakes, shaping, edging, finish texture, stripping, cleanup, and warranty are included.
Removal and saw cuttingaskPublic curb, apron, and gutter work often includes saw cutting, demolition, loading, haul-off, and disposal.
Drainage and slope responsibilityaskGutter lines, driveway transitions, inlets, and low spots need written slope and correction responsibility.
Access, traffic control, and washoutaskConfirm truck staging, chute reach, pump or buggy use, wait time, cones/signage, site protection, washout, and cleanup.
Permit, inspection, and right-of-wayaskDriveway aprons, curb cuts, public sidewalks, and street-side gutters may require permits and inspections.
Installed quote per linear footconfirmInstalled quote normalizes to about $65.00/linear ft. Compare it against material-only concrete plus scope lines.
1Does the quote list curb height, curb width, gutter width, gutter thickness, and the exact profile standard?
2Are returns, radii, curb cuts, driveway apron transitions, and tie-ins included in measured linear feet?
3Are saw cutting, demolition, haul-off, disposal, forms, stakes, finish, stripping, cleanup, and warranty written down?
4Who owns slope, drainage tie-ins, inspection corrections, traffic control, truck access, washout, and permit scheduling?

Formula

Sección transversal de bordillo y cuneta

Cross-section = curb width x curb height + gutter width x gutter thicknessCross-section = 0.2500 + 0.7500 = 1.0000

Volumen bruto de bordillo

Gross volume = linear length x cross-section x matching runsGross = 100 x 1.0000 x 1 =100.0000 ft3 (3.7037 yd3)

Desperdicio, bolsas y verificación por pie lineal

Final volume = gross volume x (1 + 10% / 100)Material per linear foot = ready-mix material + fixed fees / total linear feet

Usa the linear-foot number as a quote check

The installed quote can include excavation, saw cutting, forms, traffic control, permits, cleanup, and warranty language, so it will usually be higher than material-only concrete cost.

Ejemplos de estimados de bordillo

100 ft curb and gutter

6 in x 6 in curb plus 18 in x 6 in gutter with 10% waste.

Resultado: 4.0741 yd3 / 184 bolsas / $8.22 per ft ready-mix check

60 ft vertical curb

6 in wide x 12 in high curb-only profile.

Resultado: 1.2222 yd3 / 55 bolsas / $5.86 per ft ready-mix check

Driveway apron edge

24 ft transition with an 8 in curb and 24 in gutter apron.

Resultado: 1.3037 yd3 / 59 bolsas / $15.21 per ft ready-mix check

Medicion Noas

  • Measure curb-only, curb-and-gutter, driveway transitions, and returns separately when profiles change.
  • Use a rectangular profile as a planning check for rolled or irregular curbs, then confirm the true section.
  • Add gutter width and thickness only when that concrete is poured with the curb.
  • Keep material-only cost separate from removal, forms, traffic control, permit, and finish scope.

Antes You Aprobar a Bordillo Cotizacion

  • Confirm whether the quoted linear feet include returns, radii, curb cuts, and driveway apron transitions.
  • Ask whether saw cutting, demolition, haul-off, and disposal are included.
  • Compare forms, finish, drainage, right-of-way permits, and traffic control line by line.
  • Check truck access, chute reach, pump, buggy, wait time, and washout fees before ordering.

Bordillo Lineal-Foot Cotizacion Alcance Verificacionlist

AlcancePor que importaPreguntar antes de firmar
Dimensiones del perfilA 6 x 6 curb is a very different material check from a curb and gutter section.Does the quote list curb height, curb width, gutter width, and gutter thickness?
Linear feet and returnsEnd returns, radii, driveway transitions, and short tie-ins can add formwork.Are returns, radii, driveway aprons, and curb cuts included in the measured length?
Remoción y corte con sierraExisting curb, asphalt, sidewalk, or driveway edges can drive the installed price.Are saw cutting, demolition, loading, haul-off, and disposal included?
Forms and finishCurb profiles usually need more forming and edge work than flat slabs.Are forms, stakes, stripping, edging, finish, and cleanup written down?
Drainage and slopeGutter lines, inlets, low spots, and driveway transitions can change layout.Who is responsible for slope, drainage tie-ins, and inspection corrections?
Access and traffic controlStreet-side work may need cones, staging, pump or buggy placement, and cleanup.Does the number include access limits, traffic control, wait time, washout, and site protection?
Permit or right-of-wayAprons, public sidewalks, and curb cuts may require local approval.Who handles permits, inspection scheduling, public right-of-way rules, and corrections?

Guia de compra y cotizacion de bordillo

Use this concrete curb calculator for the material check, then normalize the installed bid by linear foot. A curb quote can change quickly when it includes removal, forms, drainage, traffic control, right-of-way permits, driveway apron tie-ins, cleanup, and warranty language.

For cost context, read the concrete curb and gutter cost guide. For bid review, use the curb and gutter contractor quote checklist and the concrete quote reviewer. If the material quantity is high, compare bags against delivery in the ready-mix vs bags calculator.

Preguntas frecuentes

How do I calculate concrete for a curb and gutter?
Convert the curb and gutter profile to square feet of cross-section, multiply by total linear feet, then divide cubic feet by 27 for cubic yards. Add waste before ordering concrete.
Does this calculator work for curb-only profiles?
Yes. Set the gutter width and gutter thickness to zero when the pour is curb only. For rolled or irregular profiles, use the closest rectangular planning profile and confirm the real section with the contractor.
Why compare cost per linear foot?
Curb work is often quoted by linear foot. Material-only cost per foot helps you compare the concrete order with an installed quote that may include removal, forms, traffic control, drainage, permits, and cleanup.
Should I use bags or ready-mix for curb work?
Short curb runs may be possible with bags, but long runs and curb-and-gutter profiles usually need ready-mix because placement speed, finish timing, and delivery access matter.
Does this replace right-of-way or permit review?
No. This is a planning calculator for material volume and quote comparison only. Confirm permits, inspections, accessibility, drainage, traffic control, and public right-of-way requirements with qualified local professionals.

Descargo de responsabilidad: This concrete curb calculator estimates material volume only. It does not verify roadway, drainage, accessibility, right-of-way, permit, traffic-control, inspection, structural, or code requirements. Confirm curb, gutter, driveway apron, and public sidewalk work with qualified local professionals.