Minimo de pedido de concreto y cargos por carga pequena

Calculadora de Minimo de Entrega de Concreto

Primero la respuesta: ingresa tu volumen y precio. Calcula si pagas el minimo de entrega o el cargo por carga pequena, y compara los totales.

Minimo tipico facturable

3 yardas cubicas

Pagar menos del minimo puede costar $50-150 extra.

Ahorro vs minimo

Hasta $300 para pedidos pequenos

El mini-mix o bolsas puede ser mas economico bajo el minimo.

Interactive workflow

Run the numbers, then save or export the project

View planning notes
Best reviewed quote
Ready-mix supplier A
Red flags
0
Proposal total
$3,824
Pour window
171 min
Entradas del revisor de cotizaciones
Resultados de revision de cotizacion
CotizaciónTotalUnidadEstado
Ready-mix supplier A
Ready-mix score 100
$760
$253.33/yd3
$3.45/sq ft
Good quote
Contractor bid B
Contractor score 83
$3,350
$1,116.67/yd3
$15.23/sq ft
Good quote
Bagged concrete run
Bagged score 74
$1,175
$391.67/yd3
$5.34/sq ft
Review scope

Ready-mix supplier A

0 missing
  • Scope checklist looks complete for this quote type.

Contractor bid B

1 missing
  • Total is more than 25% above the quote set average.
  • Missing scope: Permit, inspection, or code items.

Bagged concrete run

2 missing
  • Bagged route may be labor-heavy at this volume.
  • Missing scope: Cleanup, washout, and disposal, Pump, buggy, or wheelbarrow placement.

Guarda esta estimacion o descarga un reporte PDF

El reporte PDF usa el resultado calculado actual. Guarda la estimacion primero cuando quieras reutilizar los datos despues.

Calculo del minimo
Ve exactamente si tu pedido activa el cargo por minimo.
Comparacion de alternativas
Compara el total con mini-mix o bolsas.
Desglose de cargos
Entiende que cargos aplican para tu volumen.

Which delivery rule should you verify?

Suppliers use similar language for different billing models. The right next question depends on whether the quote is quantity-based, fee-based, or invoice-based.

Signal to checkWhat it meansNext step
"We have a 3 yd minimum"The supplier may bill 3 yd3 even if the project uses 1.2 yd3.Ask for usable yards, billable yards, unused paid yards, and the delivered total.
"Actual yards plus a short-load fee"The quote may bill the real quantity and add a separate small-order fee.Confirm the fixed fee, any per-yard surcharge, and whether a minimum invoice also applies.
"There is a minimum invoice"The final dollar total cannot fall below a floor even when actual yards are low.Request the floor, included delivery, taxes, wait time, and access terms as separate lines.

Related concrete planning tools

Move from a single calculation into a purchase, proposal, or pour-day decision with connected calculators and checklists.

Cual es el minimo de pedido?

La mayoria de plantas tienen un minimo de 3 yd3. Pedir menos significa pagar por el minimo o un cargo adicional.

Como evito el cargo por minimo?

Pide hasta el minimo, combina con vecinos, o usa mini-mix.

Que es un camion mini-mix?

Mezcla en sitio y cobra solo por lo usado. Elimina el minimo pero cuesta mas por yarda.

Vale la pena el cargo por carga pequena?

Si necesitas 1.5 yd3 y el minimo es 3 yd3, puede ser mas economico pedir el minimo que usar bolsas.

Planning disclaimer

Los cargos por minimo varian por proveedor. Siempre pregunta sobre el minimo facturable antes de ordenar.