Cout de demolition de beton au pied carre

Calculateur de Cout de Demolition de Beton

D'abord la reponse: entrez la superficie et l'epaisseur de la dalle. Obtenez la fourchette de cout de demolition et de transport.

Cout typique de demolition

2-5 $ le pied carre

Inclut la demolition et le chargement. La disposition peut ajouter 1-3 $/pi2.

Dalle de 40 m2 complete

800-2000 $ demolition + disposition

L'acces pour machinerie lourde peut reduire le cout de 30-50%.

Écran interactif de devis de démolition

Dimensions de dalle: tonnes, charges et cout d evacuation

Keep every quantity and rate visible. Replace defaults with measured sections and written contractor, hauler, recycler, or disposal inputs before comparing bids.

Unit system
ft
ft
in
qty
lb/ft3
%
$/ft2
$/ft2
ft
$/ft
$/short ton
short tons
$/load
$
$/ft2

Planning total

$1,258

$13 per ft2 from the entered scope and rates.

Concrete weight

2.5 short tons

5,000 lb / 2,268 kg before other debris and tare.

Loose debris screen

1.67 yd3

35% entered swell above solid slab volume.

Payload comparison

1 load

Comparison only; provider and legal load limits control.

Mesurer le béton caché
Add separate sections for thickened edges, footings, curbs, overlays, or slabs with different thickness instead of averaging them away.
Le poids n'est pas une approbation du conteneur
Loose yards describe occupied space; tons drive payload. Confirm tare, fill line, accepted material, included weight, and overage with the provider.
Limite d'arrêt de travail
Utilities, post-tensioning, structural connections, silica controls, hazardous coatings, and public right-of-way work require qualified review.

Interactive workflow

Run the numbers, then save or export the project

View planning notes
Best reviewed quote
Ready-mix supplier A
Red flags
0
Proposal total
$3,824
Pour window
171 min
Couts locaux par defaut et memoire ZIP

Valeurs par defaut sauvegardees

Reuse bag price, ready-mix price, delivery fee, and waste factor across quote reviews.

Hypothèses locales
ZIP47474
1 yd3 as bags$259
1 yd3 ready-mix$475
Break-even3.3 yd3
  • 80 lb bag price: $6
  • Ready-mix price per yd3: $165
  • Delivery + short-load: $310
  • Wait-time rate: $95 per hour

Enregistrez cette estimation ou telechargez un rapport PDF

Le rapport PDF utilise le resultat calcule actuel. Enregistrez dabord lestimation lorsque vous souhaitez reutiliser les donnees plus tard.

Estimation de demolition
Cout de demolition selon la superficie et l'epaisseur.
Cout d'elimination
Calculez le cout de chargement et transport.
Comparaison DIY vs pro
Comparez la location d'equipement vs embaucher une entreprise.

Concrete removal planning checklist

Confirm these items before comparing the planning total with a contractor, hauler, recycler, or disposal quote.

Signal to checkWhat it meansNext step
Thickness and hidden sectionsThickness, thickened edges, footings, curbs, overlays, and separate slab sections were measured or explicitly allowed for.Measure cores or exposed edges and price uncertain sections separately.
Utilities and slab typeUtility locating, post-tension risk, structural connections, drains, radiant heat, and hazardous coatings were reviewed.Stop and use qualified locating, engineering, environmental, or demolition review where required.
Access and protectionMachine width, gate clearance, floor or driveway capacity, dust control, noise, neighbors, lawn protection, and hand-carry distance are defined.Use the access multiplier only as a screen; replace it with a contractor method and price.
Haul and disposalThe provider confirms accepted material, payload, tare, included tons, overage, rejected loads, sorting, tickets, and final destination.Do not choose a dumpster or truck from loose volume alone.
Final site conditionThe quote says who removes steel, repairs base, backfills voids, compacts, cleans access routes, and prepares for the next trade.Photograph and approve the removal handoff before replacement work starts.

Related concrete planning tools

Move from a single calculation into a purchase, proposal, or pour-day decision with connected calculators and checklists.

Combien coute enlever une dalle de beton?

La demolition coute typiquement 2-5 $/pi2. Une entree de 40 m2 coute 800-2000 $ a enlever.

Puis-je enlever le beton moi-meme?

Oui avec equipement loue (marteau demolisseur 100-200 $/jour). C'est un travail physiquement exigeant.

Comment disposer du beton demoli?

Louez un benne (300-500 $ pour 10 vc) ou apportez a un centre de recyclage.

Est-il moins cher de reparer ou d'enlever?

Pour moins de 30% de dommages, la reparation peut etre plus economique. Pour des dommages etendus, le remplacement est preferable.

Planning disclaimer

Les estimations de cout sont des moyennes. Les couts reels varient selon l'epaisseur et l'acces.