Demolition, hauling, and disposal planning

Concrete Removal Cost Calculator

Answer first: turn slab dimensions into concrete weight, loose debris volume, haul loads, and an auditable removal cost broken into demolition, reinforcement, saw cutting, disposal, transport, fixed fees, and base repair.

10 ft x 10 ft x 4 in slab

about 2.5 short tons

At 150 lb/ft3 before soil, moisture, steel, mixed debris, or container tare is added.

One auditable total

7 visible cost lines

Breaking/loading, reinforcement, saw cuts, disposal, hauling, fixed fees, and base repair stay separate.

Interactive demolition quote screen

Slab dimensions to tons, haul loads, and removal cost

Keep every quantity and rate visible. Replace defaults with measured sections and written contractor, hauler, recycler, or disposal inputs before comparing bids.

Unit system
ft
ft
in
qty
lb/ft3
%
$/ft2
$/ft2
ft
$/ft
$/short ton
short tons
$/load
$
$/ft2

Planning total

$1,258

$13 per ft2 from the entered scope and rates.

Concrete weight

2.5 short tons

5,000 lb / 2,268 kg before other debris and tare.

Loose debris screen

1.67 yd3

35% entered swell above solid slab volume.

Payload comparison

1 load

Comparison only; provider and legal load limits control.

Measure hidden concrete
Add separate sections for thickened edges, footings, curbs, overlays, or slabs with different thickness instead of averaging them away.
Weight is not container approval
Loose yards describe occupied space; tons drive payload. Confirm tare, fill line, accepted material, included weight, and overage with the provider.
Stop-work boundary
Utilities, post-tensioning, structural connections, silica controls, hazardous coatings, and public right-of-way work require qualified review.

Interactive workflow

Run the numbers, then save or export the project

View planning notes
Best reviewed quote
Ready-mix supplier A
Red flags
0
Proposal total
$3,824
Pour window
171 min
Local cost defaults and ZIP memory

Saved cost defaults

Reuse bag price, ready-mix price, delivery fee, and waste factor across quote reviews.

Local assumptions
ZIP47474
1 yd3 as bags$259
1 yd3 ready-mix$475
Break-even3.3 yd3
  • 80 lb bag price: $6
  • Ready-mix price per yd3: $165
  • Delivery + short-load: $310
  • Wait-time rate: $95 per hour

Save this estimate or download a PDF report

The PDF report uses the current calculated result. Save the estimate first when you want to reuse the inputs later.

Weight and loose debris
See both material weight and a user-controlled loose-volume factor so disposal weight and container space are not treated as the same limit.
Quote lines stay visible
Separate breaking and loading from reinforcement, saw cutting, hauling, disposal, mobilization, permits, and base repair.
Provider inputs, not approvals
Enter the actual payload, rate, acceptance rule, and access assumption. The calculator estimates loads but never approves a dumpster or vehicle.

What basic concrete demolition calculators hide

A national cost per square foot is not a quote. The useful calculation exposes the assumptions that change labor, payload, disposal acceptance, and the condition left for replacement work.

Review the demolition quote
Benchmark saysReplace with local inputNext check
One cost-per-square-foot numberKeep breaking/loading, reinforcement, access, saw cutting, hauling, disposal, fixed fees, and base repair as separate editable lines.Ask each bidder to mark included, excluded, allowance, or unit-rate for every line.
Dumpster yards equal safe capacityShow loose debris volume and weight separately, then compare weight only with a payload entered from the provider.Confirm clean-concrete rules, container tare, fill line, included tons, overage, axle, route, and pickup limits.
Old slab out means site readyCarry an optional base-repair line so soft soil, roots, failed gravel, grading, and compaction do not disappear.Define the handoff condition before replacement pricing: debris removed, elevation checked, base repaired, and access restored.

Concrete removal planning checklist

Confirm these items before comparing the planning total with a contractor, hauler, recycler, or disposal quote.

Signal to checkWhat it meansNext step
Thickness and hidden sectionsThickness, thickened edges, footings, curbs, overlays, and separate slab sections were measured or explicitly allowed for.Measure cores or exposed edges and price uncertain sections separately.
Utilities and slab typeUtility locating, post-tension risk, structural connections, drains, radiant heat, and hazardous coatings were reviewed.Stop and use qualified locating, engineering, environmental, or demolition review where required.
Access and protectionMachine width, gate clearance, floor or driveway capacity, dust control, noise, neighbors, lawn protection, and hand-carry distance are defined.Use the access multiplier only as a screen; replace it with a contractor method and price.
Haul and disposalThe provider confirms accepted material, payload, tare, included tons, overage, rejected loads, sorting, tickets, and final destination.Do not choose a dumpster or truck from loose volume alone.
Final site conditionThe quote says who removes steel, repairs base, backfills voids, compacts, cleans access routes, and prepares for the next trade.Photograph and approve the removal handoff before replacement work starts.

Related concrete planning tools

Move from a single calculation into a purchase, proposal, or pour-day decision with connected calculators and checklists.

How do I calculate concrete removal cost?

Measure each slab section and thickness, calculate weight, then price breaking and loading, reinforcement, saw cutting, disposal, hauling, mobilization or permits, cleanup, and base repair separately. Replace every default with a local written rate before relying on the total.

How much does a 10x10 four-inch concrete slab weigh?

At 150 lb per cubic foot, a 10 ft by 10 ft slab at 4 inches thick weighs about 5,000 lb or 2.5 short tons. Soil, moisture, steel, coatings, mixed debris, equipment, and container tare are not included unless added elsewhere.

Does broken concrete take more dumpster space?

Usually yes. Broken pieces create voids, so loose debris can occupy more space than the solid slab. The calculator keeps a user-editable swell percentage, but weight and provider payload can still limit the load before container volume does.

Does rebar increase concrete removal cost?

Rebar or wire mesh can increase cutting, breaking, separation, sorting, and loading work. Select the reinforcement type and enter the premium quoted for the actual slab instead of assuming one universal markup.

Can this calculator choose a dumpster or approve a haul load?

No. It compares estimated material weight with a payload you enter. The provider must confirm container type, tare, allowed material, fill line, included tons, overage, truck and axle limits, route, placement, and pickup rules.

Planning disclaimer

This calculator is a planning and quote-comparison tool. It does not locate utilities, identify post-tensioning or hazardous material, approve demolition methods, structural work, dust controls, vehicles, trailers, dumpsters, axle weights, routes, disposal acceptance, permits, or legal payload. Confirm dimensions, slab construction, provider limits, local rates, scale tickets, site conditions, and qualified professional or regulatory requirements.