Cubic yards from dimensions — with waste factor

How to Calculate Concrete Yardage

Answer first: Cubic yards = (Length × Width × Thickness in feet) ÷ 27. Add 10% waste. Use the calculator below for instant results.

Formula

yd³ = (L × W × T) ÷ 27

L, W in feet. T in feet (divide inches by 12). Add 5–15% waste.

10 × 10 ft, 4 in thick

1.23 yd³ with 10% waste

That's about 56 bags of 80 lb concrete.

Concrete yardage calculator

Calculate Concrete Yardage

10 × 10 × (4/12) ÷ 27 × 1.10 = 1.36 yd³

Cubic yards

1.36

Cubic feet

36.7

80 lb bags

62

Interactive workflow

Run the numbers, then save or export the project

View planning notes
Best reviewed quote
Ready-mix supplier A
Red flags
0
Proposal total
$3,824
Pour window
171 min
Local cost defaults and ZIP memory

Saved cost defaults

Reuse bag price, ready-mix price, delivery fee, and waste factor across quote reviews.

Local assumptions
ZIP47474
1 yd3 as bags$259
1 yd3 ready-mix$475
Break-even3.3 yd3
  • 80 lb bag price: $6
  • Ready-mix price per yd3: $165
  • Delivery + short-load: $310
  • Wait-time rate: $95 per hour

Save this estimate or download a PDF report

The PDF report uses the current calculated result. Save the estimate first when you want to reuse the inputs later.

The formula
Cubic yards = (L × W × thickness ÷ 12) ÷ 27. Thickness in inches gets divided by 12 to convert to feet first.
Waste factor
Always add 5–15% to your calculated volume. Use 10% for flat slabs, 15% for forms with curves or complex shapes.
Bags vs ready-mix
Once you have cubic yards, the calculator shows bag count and both costs so you can pick the cheaper option.

The concrete yardage formula — explained

Three steps to go from dimensions to a ready-mix order.

Open full concrete calculator
Benchmark saysReplace with local inputNext check
Step 1: cubic feetMultiply length (ft) × width (ft) × thickness (ft). Convert thickness from inches: 4 in = 4/12 = 0.333 ft.10 ft × 10 ft × 0.333 ft = 33.3 cubic feet.
Step 2: cubic yardsDivide cubic feet by 27 (there are 27 cubic feet in a cubic yard).33.3 ÷ 27 = 1.23 cubic yards.
Step 3: add wasteMultiply by 1.10 (10% waste) for a typical pour.1.23 × 1.10 = 1.35 yd³ to order. The calculator above does all three steps.

Concrete yardage checklist

Before calling a ready-mix plant with your order.

Signal to checkWhat it meansNext step
Dimensions measuredLength, width, and thickness measured at the actual site.Measure twice — being off by 1 inch on a large slab adds up fast.
Waste addedAdded 5–15% waste to the calculated volume.Use 10% for flat slabs. Add more for steps, curved edges, or uneven sub-base.
Order rounded upRounded up to the nearest 0.25 yd³.Plants typically sell in 0.25 yd³ increments. Running short mid-pour causes cold joints.
Minimum checkedConfirmed the plant's minimum load (typically 1–3 yd³).Small orders may trigger a short-load fee. Ask when you call.

Related concrete planning tools

Move from a single calculation into a purchase, proposal, or pour-day decision with connected calculators and checklists.

How do I calculate concrete yardage?

Multiply length × width × (thickness ÷ 12) to get cubic feet, then divide by 27. Formula: yd³ = (L × W × T) ÷ 27, where T is thickness in feet (inches ÷ 12). Add 10% waste.

How many cubic yards of concrete do I need for a 10×10 slab?

A 10×10 ft slab at 4 inches thick needs 1.23 cubic yards (with 10% waste). The calculation: 10 × 10 × (4/12) = 33.3 ft³ ÷ 27 = 1.23 yd³ × 1.10 waste = 1.35 yd³ to order.

How many 80 lb bags of concrete in a cubic yard?

About 45 bags of 80 lb concrete (at 0.6 ft³ each) make one cubic yard. With 10% waste, plan for about 50 bags per yard.

How much is a yard of concrete?

Ready-mix concrete typically costs $150–$200 per cubic yard plus a delivery fee of $100–$200. Prices vary by region and mix design. Use the concrete cost calculator for a local estimate.

Do I need to add waste when calculating concrete?

Yes. Always add 5–15% to your calculated volume. Use 10% for flat, simple slabs. Use 15% for uneven ground, complex shapes, or forms you're not sure about. Running short mid-pour causes cold joints that weaken the slab.

Planning disclaimer

Calculated volumes include a standard waste factor. Actual concrete needed depends on sub-base conditions, form accuracy, and pour technique. Confirm your order with a ready-mix supplier.