Truck capacity, minimums, and your order size

How Many Yards of Concrete in a Cement Truck

Answer first: A standard ready-mix truck holds 8–10 cubic yards. Most plants require a minimum of 1–3 yd³. Calculate your exact order size below.

Standard truck capacity

8–10 cubic yards (full load)

Most residential orders are 1–5 yd³ — well under a full truck.

Minimum load

1–3 yd³ at most plants

Below minimum, plants charge a short-load fee of $50–$200.

Truck capacity quick reference

Concrete Truck Capacity

Standard transit truck

8–10 yd³

Most ready-mix deliveries

Mini-mix / short-load

1–4 yd³

Tight access and small jobs

Typical residential order

1–5 yd³

Slab, driveway, or footing

Interactive workflow

Run the numbers, then save or export the project

View planning notes
Best reviewed quote
Ready-mix supplier A
Red flags
0
Proposal total
$3,824
Pour window
171 min
Local cost defaults and ZIP memory

Saved cost defaults

Reuse bag price, ready-mix price, delivery fee, and waste factor across quote reviews.

Local assumptions
ZIP47474
1 yd3 as bags$259
1 yd3 ready-mix$475
Break-even3.3 yd3
  • 80 lb bag price: $6
  • Ready-mix price per yd3: $165
  • Delivery + short-load: $310
  • Wait-time rate: $95 per hour

Save this estimate or download a PDF report

The PDF report uses the current calculated result. Save the estimate first when you want to reuse the inputs later.

Truck capacity facts
Standard transit mix trucks hold 8–10 yd³. Short-load trucks and mini-mix trucks carry 1–4 yd³ for smaller jobs.
Your order calculator
Enter your slab dimensions to calculate exactly how many yards you need — then compare to the truck minimum.
Cost with delivery
See full delivery cost including per-yard price, delivery fee, and short-load surcharge if your order is below minimum.

Concrete truck capacity: the facts

Understanding truck size helps you know when to expect a full truck vs a partial load, and why short-load fees exist.

Calculate delivery cost
Benchmark saysReplace with local inputNext check
Assumed full truck = cheaperMost residential pours are 1–4 yd³. Plants send a full truck but charge by the yard — full trucks aren't cheaper per yard.Calculate your yd³ and compare to the plant's minimum load.
Unknown minimumMost plants require 1–3 yd³ minimum. Below that, short-load fees of $50–$200 apply.Ask about minimums when you call — enter the fee in the calculator.
Only concerned with capacityThe real question is: does your order match a full truck, require a partial load, or fall below minimum?Use the calculator to get your yd³, then call a local plant to confirm.

Concrete truck order checklist

Know this before ordering a concrete truck.

Signal to checkWhat it meansNext step
Your cubic yardageYou have a yd³ estimate from your dimensions.Use the calculator in the workflow — enter length, width, thickness.
Plant minimumYou know the plant's minimum load requirement.Call the plant and ask: "What's your minimum load and short-load fee?"
Pour timingYou have a 4–6 hour window for delivery, placement, and finishing.Book the pour early in the day and have a crew ready when the truck arrives.
Access confirmedThe truck can access the pour location.Standard trucks need an 8–10 ft wide path and 14 ft vertical clearance.

Related concrete planning tools

Move from a single calculation into a purchase, proposal, or pour-day decision with connected calculators and checklists.

How many yards of concrete does a cement truck hold?

A standard transit mix truck holds 8–10 cubic yards of concrete. Most residential orders are 1–5 yd³ — well under a full truck load.

How many cubic yards in a concrete truck?

A typical ready-mix truck carries 8–10 yd³. Mini-mix trucks for tight access carry 1–4 yd³. Volumetric trucks can mix any amount on site.

How much does a truck of concrete cost?

A full 8-yd³ load at $150–$200/yd³ plus delivery runs $1,400–$1,800 total. Most residential jobs use partial loads. Calculate your exact yardage and compare local quotes.

What is the minimum order for a concrete truck?

Most ready-mix plants require 1–3 cubic yards minimum. Orders below the minimum get a short-load fee, typically $50–$200. Ask the plant for their specific minimum when you call.

How long does it take a concrete truck to deliver?

Most plants can deliver within 1–3 business days. During spring and summer, book 1 week ahead. The truck typically stays on site 30–90 minutes depending on pour size.

Planning disclaimer

Truck capacity and pricing figures are typical ranges. Actual capacity, minimums, and fees vary by plant and region. Always confirm with your local ready-mix supplier.